Real construction has begun

This is a temporary forum to be used for all topics related to the new track and it's construction
Locked
User avatar
John Kwong
Posts: 1317
Joined: Wed Sep 24, 2008 8:00 am
First Name: John
Last Name: Kwong
City/Town: Calgary
Location: Calgary
Contact:

Real construction has begun

Post by John Kwong »

https://www.facebook.com/calgarykart.ra ... n=timeline
Grader copy.JPG
Grader copy.JPG (111.67 KiB) Viewed 4104 times
IMG_4121 copy.JPG
IMG_4121 copy.JPG (108.15 KiB) Viewed 4104 times
IMG_4122 copy.JPG
IMG_4122 copy.JPG (120.57 KiB) Viewed 4104 times
IMG_4123 copy.JPG
IMG_4123 copy.JPG (121.41 KiB) Viewed 4104 times
IMG_4124 copy.JPG
IMG_4124 copy.JPG (121.12 KiB) Viewed 4104 times
IMG_4125 copy.JPG
IMG_4125 copy.JPG (121.29 KiB) Viewed 4104 times
IMG_4126 copy.JPG
IMG_4126 copy.JPG (121.99 KiB) Viewed 4104 times
John Kwong___CIR Realty___403-714-5583
www.johnkwong.ca
http://kartopractor.weebly.com/

User avatar
John Kwong
Posts: 1317
Joined: Wed Sep 24, 2008 8:00 am
First Name: John
Last Name: Kwong
City/Town: Calgary
Location: Calgary
Contact:

Re: Real construction has begun

Post by John Kwong »

CounterClockwise tour of the track on the quad with 85% of the gravels placed so far:

https://www.youtube.com/watch?v=loX4QvIJ43s

John K
John Kwong___CIR Realty___403-714-5583
www.johnkwong.ca
http://kartopractor.weebly.com/

User avatar
SteveO
Posts: 328
Joined: Tue Jan 11, 2011 7:16 am
First Name: Steve
Last Name: Orton
City/Town: Calgary

Re: Real construction has begun

Post by SteveO »

That's looking awesome!
Stephen Orton

Locked