Grandtands
Posted: Fri Jul 10, 2015 11:40 am
Just an update on the grandstand status:
This is probably the priority at the facility - but we recognized that it was not going to be completed for this weekend.
We have still to do:
Pack the newly re- leveled gravel base
move the stands into place on the packed base
Re install the small cover plates between the three sections of stands ( volunteer work)
Terry F. has replaced the handrail at the front with round bar (this can be painted Tremclad blue when ever someone has time). We will also be raising the front handrails but this will not require repainting.
Netting for the side rails can be installed as soon as it arrives (now due in Calgary Monday 13th - should be at track early next week and can be installed immediately - sheet metal screws and washers)
We MIGHT get the stands ready by the TAK weekend, more likely during the TAK weekend and after that it must be approved by our engineer. So the earliest this is likely is by the weekend of Jul 25 /26
This is probably the priority at the facility - but we recognized that it was not going to be completed for this weekend.
We have still to do:
Pack the newly re- leveled gravel base
move the stands into place on the packed base
Re install the small cover plates between the three sections of stands ( volunteer work)
Terry F. has replaced the handrail at the front with round bar (this can be painted Tremclad blue when ever someone has time). We will also be raising the front handrails but this will not require repainting.
Netting for the side rails can be installed as soon as it arrives (now due in Calgary Monday 13th - should be at track early next week and can be installed immediately - sheet metal screws and washers)
We MIGHT get the stands ready by the TAK weekend, more likely during the TAK weekend and after that it must be approved by our engineer. So the earliest this is likely is by the weekend of Jul 25 /26